CREDENTIALS
CREDENTIALS:
-
1. PROJECT: - North Field expansion (NFE) End Client -Qatar GAS, Via R I QUADRO PROGETTI SNC, Italy PREPARATION OF E&I DELIVERABLES, IO, INSTRUMENT INDEX (Intools), INSTRUMENTS DATA SHEET, VFD DATA SHEET.
- 2. PROJECT: - NAVIGATOR PAPER SETUBAL S.A , Italy Via IPC Consulting , Italy
PREPARATION OF E&I DELIVERABLES, IO LIST, INSTRUMENT INDEX, INSTRUMENTS DATA SHEET, ELECTRICAL LOAD LIST , VFD DATA SHEET, SINGLE LINE DIAGRAM , INSTRUMENT HOOKUP .
-
3. PROJECT :-FEED E&I ENGINEERING FINNISH MINERAL GROUP SALT SPLIT SODIUM SULFATE SOLUTION , Italy Via IPC Consulting , Italy
PREPARATION OF E&I DELIVERABLES, IO LIST, INSTRUMENT INDEX, INSTRUMENTS DATA SHEET, MATERIAL REQUISITION.
-
4. PROJECT: - HPCL, LPG BOTTLING PLANT, JAMSHEDPUR VIA BLUE ENGINEERING CONSTRUCTION–AJMER, RAJASTHAN
PREPARATION OF HPCL, LPG BOTTLING PLANT UTILITY PIPING AND FIRE HYDRENT LAYOUT AND ISOMETRIC DRAWING PREPARATION.
-
5. PROJECT: - HPCL, NEW POL TERMINAL, HISAR, HARYANA VIA BLUE ENGINEERING CONSTRUCTION – AJMER, RAJASTHAN
PREPARATION OF GA & DETAIL FABRICATION DRAWING OF FIRE FOAM TANK, THICKNESS CALCULATION VESSEL DESIGN, WPS& PQR FOR SS WELDING, QAP FOR FBARICATION & TESTING AS PER CODE USED IN THE DRAWING CONSIDERING THE TPIA SCOPE OF INSPECTION & TESTING.
-
6. PROJECT: - DCPL, ACF AND DMF ENGINEERING VIA FONTIKULUS CONSTRUCTION – KOLKATA
PREPARATION OF GA & DETAIL FABRICATION DRAWING OF ACTIVATED CARBON FILTER AND DUAL MEDIA FILTERVERTICAL VESSEL, THICKNESS CALCULATION VESSEL DESIGN.
-
7. PROJECT: - IOCL, HALDIA, CDU-1 REVAMP PROJECT VIA ORIENTAL NICCO PROJECT – KOLKATA
PREPARATION OF IOCL, CDU-1 REVAMP PROJECT STEAM AND UTILITY PIPING GA, DETAIL AND ISOMETRIC DRAWING PREPARATION.
-
8. PROJECT: - 350TPD, DRI PLANT PIPING VIA Approach System Pvt. Ltd.– KOLKATA
PREPARATION OF UTILITY PIPING GA, DETAIL AND ISOMETRIC DRAWING PREPARATION. WITH LINE SIZING CALCULATION.
-
9. PROJECT: - NMDC, NAGARNAR,BOILER STEAM PIPING VIA Vallabha Industrial Chemical Engineers Pvt Ltd, Vadodara
PREPARATION OF STEAM PIPING GA, DETAIL AND ISOMETRIC DRAWING PREPARATION. WITH STRESS ANALYSIS.
-
10. PROJECT: - YTPS,KPCL, 2X800MW FLUE GAS DESULPHARIZATION PROJECT VIA ERC ERC Technology pvt. ltd
PREPARATION AND CHECKING OF UTILITY PIPING GA, DETAIL AND BOQ.
-
11. PROJECT: - RTPS,KPCL, RAICHUR TPS (7X210 MW + 1X250 MW) WET LIME STONE FLUE GAS DESULPHURIZATION PLANT FOR 7 X 210MW (UNIT-1 TO 7) AND 1 X 250MW (UNIT – 8) OF RAICHUR THERMAL POWER STATION VIA ERC ERC Technology pvt ltd
PREPARATION OF GA & DETAIL FABRICATION DRAWING OF ALL TANKS FOR ABOVE PROJECT,
-
12. PROJECT: - TATA STEEL , JAMSHEDPUR, CRM UTILITY, COGD & H2 PSA PLANT VIA AGRANI ENGINEERS
PREPARATION OF UTILITY PIPING GA, DETAIL AND ISOMETRIC DRAWING PREPARATION. WITH LINE SIZING CALCULATION.
-
13. PROJECT: - BMM ISPAT HOSAPETE, KARNATAKA, INDIA NEW BLAST FURNACE (0.88 MTPY) BLAST FURNACE / OVERALL VIA DANIELI CORUS.
ENGINEERING CONSULTANCY AND OVERAL ULITILIY PIPING.
-
14. PROJECT: - FEED ENGINEERING OF WASTE EATER TREATMENT PLANT OF FINNISH MINERAL GROUP VIA ITALIAN CONSULATNT Luca Meschini Viterbo - ITALY
PREPARATION OF IO LIST INSTRUMENT LIST, PREPARATION OF INSTRUMENT DATA SHEET ,SINGLE LINE DIAGRAM , JUNCTION BOX SCHEDULE , CABLE LIST AND CABLE TRAY LAYOUT.
-
15. PROJECT: - FEED ENGINEERING OF WASTE EATER TREATMENT PLANT (RO, EDI , MBR)OF JOHNSON MATTHEY BATTERY MATERIAL LIMITED VIA ITALIAN CONSULATNT Luca Meschini Viterbo - ITALY
PREPARATION OF IO LIST INSTRUMENT LIST, PREPARATION OF INSTRUMENT DATA SHEET, SINGLE LINE DIAGRAM, JUNCTION BOX SCHEDULE, CABLE LIST AND CABLE TRAY LAYOUT.
-
16. PROJECT: - HPCL, POL DEPOT PLANT PROJECT, HISAR, HARYANA EPC CONTRACTOR: M/S BLUE STAR ENGINEERING CONSTRUCTION.
JOB SCOPE: - DESIGN ENGINEERING, SUPPLY & ERECTION OF ALL ELECTRICAL AND INSTRUMENTATION PACKAGE. COMPLIANCE TO HPCL OIL AND GAS SPECIFICATION A COMPLETE EPC PROJECT.
-
17. PROJECT: - 200 TPD STARCH PLANT PROJECT. KISANGANJ, BIHAR.
CLIENT : M/S REGAL RESOURCES PVT LTD, KISANGANJ, BIHAR.
JOB SCOPE: - ERECTION AND TESTING, COMMISSIONING OF ONE NUMBER OF 2000 KVA AND TWO NUMBERS OF 1600 KVA TRANSFORMER, ERECTION OF CABLE TRAY OF THE PLANT INCLUDING BOILER AND ESP SECTION, CABLE LYING, GLAND AND TERMINATION. TERMINATION OF HT CABL INSTALLATION OF CHEMICAL EARTH PITS. ERECTION AND LYING OF EARTH STRIP BY CONNECTING ALL THE ELECTRICAL EQUIPMENT. ELECTRICAL HT SWITCH GEARS (INDOOR VCB PANEL) ERECTION & TESTING.
-
18. PROJECT: - 500 TPD ROLLING MILL PROJECT, DURGAPUR, WB.
CLIENT: - M/S SHYAM STEEL INDUSTRIES LTD, BAMUNARA, DURGAPUR, WB.
JOB SCOPE: - ERECTION OF 33 KV HT PANEL, PCC & MCC PANEL, DC & AC DRIVE PANEL, VFD PANEL. INSTALLATION OF CABLE TRAY OF THE ROLLING MILL. LYING & TERMINATION HT & LT (POWER, CONTROL, SIGNAL,
SERIAL) CABLE. TERMINATION AND FERRULING OF POWER, CONTROL AND SIGNAL CABLE. LAID DOWN EARTH STRIP AND EARTHING OF VARIOUS ELECTRICAL EQUIPMENT.
-
19. PROJECT: - 2X100 TPD WIRE MILL PROJECT, DURGAPUR, WB
CLIENT: - M/S SHYAM STEEL INDUSTRIES LTD. BAMUNARA, DURGAPUR, WB.
JOB SCOPE: - ERECTION OF PCC & MCC PANEL, VFD PANEL, LOCAL CONTROL PANEL,
INSTALLATION OF CABLE TRAY AT THE WIRE
MILL. TERMINATION AND FERRULING OF POWER, CONTROL, SIGNAL & SERIAL CABLE. LAID
DOWN EARTH STRIP AND EARTHING OF
VARIOUS ELECTRICAL EQUIPMENT.
-
20. PROJECT: - NEW 11 KV SUB-STATION FOR SMS & COAL PULVERIZER.
CLIENT: - M/S SHYAM STEEL INDUSTRIES LTD. ANGADPUR, DURGAPUR, WB.
JOB SCOPE: - ERECTION OF 11 KV HT PANEL, HT & CONTROL CABLE LYING, INSTALLATION OF
EARTH PIT, LAID DOWN EARTH
STRIP AND EARTHING OF HT PANEL.
-
21. PROJECT: - JIWANSAGAR REALTY HOUSING COMPLEX, BHAGALPUR, BIHAR.
CLIENT- M/S JIWANSAGAR REALTY PVT LTD.
JOB SCOPE: - DESIGN, SUPPLY & COMMISSIONING OF PCC, METERING & PDB PANEL.
-
22. PROJECT: - INTER PLANT PIPELINE & GAS MIXING AND BOOSTING STATION. NMDC, CHHATISGARH
CLIENT- M/S ORIENTAL EPC PVT LTD.
JOB SCOPE: - ERECTION OF PCC & MCC PANEL, VFD PANEL, PLC PANEL, LOCAL CONTROL
PANEL. INSTALLATION OF CABLE TRAY.
LYING OF POWER AND CONTROL CABLE. TERMINATION AND FERRULING OF POWER,
CONTROL CABLE. LAID DOWN EARTH STRIP
AND EARTHING OF VARIOUS ELECTRICAL EQUIPMENT.
-
23. PROJECT: -TESTING & CALIBRATION WORKS AT M/S IOCL, DURGAPUR.
CLIENT: - M/S ELMECH ENTERPRISE.
JOB SCOPE: - TESTING & CALIBRATION OF ELCTRO-MAGNETIC RELAY, THERMAL OVERLOAD
RELAY, AMMETER & VOLTMETER.
-
24. PROJECT: -TESTING & SERVICING OF 11 KV PANEL
CLIENT: -M/S MES, AMRAPALI, JHARKHAND. CLIENT- M/S BHARTI ELECTRICAL POINT.
JOB SCOPE: - TESTING, SERVICING, TROUBLESHOOTING & RETROFITTING OF HT PANEL, PT
MOUNTING & COMMISSIONING.
-
25. PROJECT: - 28 TPH AFBC BOILER AT M/S GLOBES SPRIT LTD, WB.
CLIENT: - M/S CHEEMA BOILER LTD.
JOB SCOPE: - ERECTION OF VARIOUS FIELDS INSTRUMENTS AND OTHER ELECTRICAL
EQUIPMENT AND SWITCHGEARS, COMMISSIONING OF ELECTRO STATIC PRECIPITATOR.
-
26. PROJECT: - CADMIUM LEACHING PLANT AT M/S HINDUSTAN ZINC LTD, RAJASTHAN.
CLIENT: - M/S WE CAN SOLUTION CONSULTANCY.
JOB SCOPE: - DESIGN AND DETAIL (E&I) ENGINEERING OF CADMIUM LEACHING PLANT.
DELIVER OF HIGH QUALITY ENGINEERING AND DESIGN WHICH INCLUDES, CABLE TRAY LAYOUT, CABLE SCHEDULING, I/O CALCULATION, EARTHING LAYOUT, VOLTAGE DROP CALCULATION, SINGLE LINE DIAGRAM, LPBS LAYOUT.
-
27. PROJECT: - UNDER GROUND PROJECT, KRISHNANAGAR. WBSEDCL. WB
CLIENT: - KEI INDUSTRIES LTD.
JOB SCOPE: - TESTING OF 27 NOS. SIEMENS, ABB MAKE 11 KV RING MAIN UNIT.
-
28. PROJECT: - TESTING OF 33 KV OUTDOOR SWITCHYARD AT M/S SHYAM STEEL INDUSTRIES.
CLIENT: - M/S SHYAM STEEL INDUSTRIES LTD. BAMUNARA, DURGAPUR, WB.
JOB SCOPE: - TESTING OF 33 KV TRANSFORMER & FEEDER PROTECTION RELAY. TRIPPING
TEST OF OUTDOOR VCB THROUGH
PRIMARY INJECTION OF CURRENT.
-
29. PROJECT: - TESTING OF 33 KV INDOOR SUBSTATION AT M/S NILKAMAL LTD. BANKURA,WB.
CLIENT: -M/S SPEPL,DURGAPUR,WB.
JOB SCOPE: - TESTING OF 33 KV TRANSFORMER. TESTING OF FEEDER PROTECTION RELAY
THROUGH SECONDARY INJECTION OF
CURRENT. TRIPPING TEST OF VCB THROUGH PRIMARY INJECTION OF CURRENT.
-
30. PROJECT: - TESTING OF 33 KV INDOOR SUBSTATION & PCC PANEL AT M/S SURYA ALLOY INDUSTRIES LTD, BANKURA, WEST BENGAL.
CLIENT: -M/S SURYA ALLOY INDUSTRIES LTD, BARJORA, BANKURA, WEST BENGAL.
JOB SCOPE: - TESTING OF 33 KV INDOOR SUBSTATION. TESTING OF FEEDER PROTECTION
RELAY THROUGH SECONDARY
INJECTION OF CURRENT. TRIPPING TEST OF VCB THROUGH PRIMARY INJECTION OF CURRENT.
TESTING & SERVICING OF ACB.
SUPPLY OF PROTECTION RELAY.
-
31. PROJECT: - SUPPLY & TESTING WORKS AT M/S MES, PURNEA, BIHAR.
CLIENT: -M/S ALAM ENTERPRISE.
JOB SCOPE: - SUPPLY & INSTALLATION OF 11 KV PT & VCB SPARE PARTS. RETROFITTING,
TESTING & COMMISSIONING OF HT PANEL.
-
32. PROJECT: - TESTING OF 11 KV INDOOR SUBSTATION AT M/S SURYA ALLOY INDUSTRIES LTD, DURGAPUR, WEST BENGAL.
CLIENT: -M/S SURYA ALLOY INDUSTRIES LTD, DURGAPUR, WEST BENGAL.
JOB SCOPE: - SUPPLY AND INSTALLATION OF VCB SPARE PARTS. TESTING OF 11 KV INDOOR
SUBSTATION INCLUDING TESTING OF FEEDER PROTECTION RELAY THROUGH SECONDARY INJECTION OF CURRENT. TRIPPING TEST OF VCB THROUGH PRIMARY INJECTION OF CURRENT.
-
33. PROJECT: - TESTING OF 33 KV OUTDOOR VCB AT M/S IMPEX FERRO TECH LTD, MAITHON, WEST BENGAL.
CLIENT: - M/S SPEPL, DURGAPUR, WB
JOB SCOPE: - TESTING & OVERHAULING OF 33 KV OUTDOOR VCB.